Due to production issues, shipping delays occurred for many J 35D subsystems, resulting in the two Original J 35D sequence becoming shipped with only areas of the prepared avionics mounted.Right before it was decided to acquire the JAS 39 Gripen in the late 1970s, an intense analyze was carried out on an AJ 35 modification for your remaining S 35E